The two terms are often used interchangeably, and on many projects they are one document. When they are separate, they do different jobs.
Lists every inspection and test activity, its reference document, its acceptance criterion and who intervenes: hold (H), witness (W), review (R) or surveillance (S) for the vendor, the purchaser, the third-party inspector and class.
Where it is a separate document, it usually describes the vendor’s own manufacturing controls: incoming material, in-process checks, records. Naming varies by company and project, so always read the project specification.
Send the PO scope, ITP and vendor location. Reply within 24 h (working days).